Number | Value |
---|---|
1 | Pipeline Protection |
1.1 | Complies with Wayleave Conditions |
2 | Master Planning |
2.1 | Complies with IDP/IBWSMP/AIDR |
2.2 | Will pipeline be duplicated in the same servitude in the near future |
3 | Pipeline Assets |
3.1 | Condition of asset acceptable |
3.2 | Improvement plans |
3.3 | Maintenance strategy |
3.4 | Renovation program |
4 | BWD |
4.1 | Pipeline access |
5 | Design – Pipelines |
5.1 | Check new imposed loads on the existing pipeline |
6 | Design – Civil |
6.1 | Reviewed Design Report on structural design |
7 | Assets Electrical |
7.1 | Powerlines / substation next to pipelines |
7.2 | Protection required against straight current |
8 | Risk – All |
8.1 | Risk identified on pipeline breach |