Design Review Questions

Index

Number Value
1 Pipeline Protection
1.1 Complies with Wayleave Conditions
2 Master Planning
2.1 Complies with IDP/IBWSMP/AIDR
2.2 Will pipeline be duplicated in the same servitude in the near future
3 Pipeline Assets
3.1 Condition of asset acceptable
3.2 Improvement plans
3.3 Maintenance strategy
3.4 Renovation program
4 BWD
4.1 Pipeline access
5 Design – Pipelines
5.1 Check new imposed loads on the existing pipeline
6 Design – Civil
6.1 Reviewed Design Report on structural design
7 Assets Electrical
7.1 Powerlines / substation next to pipelines
7.2 Protection required against straight current
8 Risk – All
8.1 Risk identified on pipeline breach